|
Marina Signature Projects |
|
To download our Marina Signature Projects, please click here.
|
Dubai Harbour Marina
Location: |
Dubai, UAE |
Client/Operator: |
MERAAS |
Relevance: |
Unifloat® concrete pontoon system installation |
Number of Berths: |
556 |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Manufacturing/Construction |
|
Award winning developer MERAAS Holding worked with Septech to design and build Dubai Harbour Marina, located at the intersection of the iconic Palm Jumeirah and Bluewater’s. The largest marina in the region and a unique waterfront neighbourhood is a stone’s throw away from the city’s most-loved landmarks.
Septech, acting as a specialised marina contractor has design and build 556 marina berths successfully and delivered this project to Meraas Holding in 2020 including all associated marina services.
|
|
Marasi Business Bay Marina
Location: |
Dubai, UAE |
Client/Operator: |
Dubai Properties |
Relevance: |
First Unifloat® concrete pontoon system installation in the region |
Number of Berths: |
157 |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
|
Dubai Marasi Business Bay is being developed by dubai holding company. Dubai Properties Group and is set to span 12km of waterfront promenade on the dubai water canal project at Dubai Creek. It's cued to become a major landmark in dubai, an inspirational residential, leisure and retail community building on the heritage of Dubai Creek.
Marasi Business Bay represents another of Dubai Holding's strategic and innovative project, promoting economic diversification and growth through boosting tourism, leisure and real estate sectors and creating an aspirational landmark community.
|
|
Marsa Al Seef Marina
Location: |
Dubai, UAE |
Client/Operator: |
Meraas |
Relevance: |
First Unifloat® concrete pontoon system installation in the region |
Number of Berths: |
77 |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
|
Rediscover the heart of Dubai through the busting promenade at Al Seef, and breathe in the atmosphere created by cafes, restuarents, shops, and an events plaza, where shows, events and cultural activities attract people from near and far to the waterfront where fisherman, pearl-divers, weavers and tradesmen once came togather to trade.
Located along the shores of Dubai's much-loved creek, close to al Fahidi Cultural Historical Neighbourhood, Al seef is designed to reflect the city's culture and heritage, as well as its status as a modern cosmopolitan city. visitors to the destination can choose to enjoy a casual dinner as they watch dhows make their way up and down this unique waterway, and wander the interconnected paths and walkways filled with exiciting retail concepts that connect to create a rich, diverse and vibrant place.
|
|
Omniyat Jetty
Location: |
Dubai, UAE |
Client/Operator: |
Omniyat |
Relevance: |
First Unifloat® concrete pontoon system installation in the region |
Number of Jetties: |
2 Jetty |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
|
The Omniyat Jetty is located within the Palm Jumeirah Development in Dubai, UAE. The jetty is a drop-on and drop-off jetty to service the high-end residential development located on the trunk of Palm Jumeirah and is situated for use of vessels up to 30m in length which is typically categorized as a mega yacht. 2 boats is allowed to be moored on the jetty
|
|
Dubai Festival Marina
Location: |
Dubai, UAE |
Client/Operator: |
Dubai Festival City/IGY |
Relevance: |
First Unifloat® concrete pontoon system installation in the region |
Number of Berths: |
74 (15-35m vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
Timeline: |
4 Months |
|
Dubai Festival City Marina is located at the heart of Dubai Festival City on the banks of Dubai Creek. The water front promenade links the marina to the InterContinental and Crown Plaza hotels and the Festival Centre.
The mediterranean-inspired marina has several unique customised features that include extra wide pontoons, a helicopter pad, Wifi, in-slip sewage pumpout, customised services pedestals and stainless steel mooring bollards. Dubai Festival City Marina is the region’s leading yacht dealer showcase marina and consistently gets coverage in leading publications such as Marina World. It is also a winner of the 2008 Arabian Gulf Yachting Awards.
The project’s scope included all phases from design to complete installation of the entire marina. |
|
Dubai Yacht Club Marina
Location: |
Dubai, UAE |
Client/Operator: |
Emaar |
Relevance: |
New construction of concrete marina pontoon system |
Number of Berths: |
114 (10-30m vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
Timeline: |
10 Months |
|
Dubai Marina Yacht Club (DMYC) is the first of the three marinas under the Dubai Marina stage 3 contract with Emaar. DMYC serves as the Central Port Authority for all boating operations in the Dubai Marina canal.
An elegant yacht club sits as the centrepiece icon for the marina. The marina was redesigned post contract award to accomodate various vessel sizes due to the rapidly changing boating market in the area. The marina features extra wide berths, full MEP services with speakers integrated within the pedestals and sewage pumpout services. Special fixings were designed and incorporated into the pontoons to accomodate Emaar’s signature flag poles. |
|
Yas Marina
Location: |
Abu Dhabi, UAE |
Client/Operator: |
Aldar |
Relevance: |
New concrete pontoon system installed in the dry |
Number of Berths: |
144 (14-66 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
|
The first of Aldar’s marinas to be constructed, Royal Yas Marina is positioned alongside the Formula 1 race track located on Yas Island in Abu Dhabi.
Extra wide walkways provide the marina with additional room to accomodate golf carts and an extra luxury feel. The marina will offer first class services such as sewage pumpout, fuel dock and underwater LED lights. The majority of the marina will be constructed in the dry, final connections will occur past flooding of the basin. |
|
Jumeirah Beach Hotel Marina Redevelopment
Location: |
Dubai, UAE |
Client/Operator: |
Jumeirah |
Relevance: |
Marina rebuild- existing lightweight pontoon system replaced with modern concrete floating pontoons and utilising phased construction |
Number of Berths: |
144 (14-66 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
Timeline: |
4 Months |
|
Septech was comissioned to completely remove the existing lightweight pontoon system piles, MEP services and design and construct a new concrete marina pontoon system within a 4-month time frame. In addition, Septech was required to maintain available slips for vessels, and therefore utilised a phased construction programme to accomodate the operators’ needs.
The marina offers first class services and dockage furniture such as customised stainless steel mooring bollards and luxury dock boxes. The marine works included pontoon systems with curved design, MEP service pedestals with integrated sewage pumpout, SOS pedestals gangways. |
|
The Wave, Muscat
Location: |
Muscat, Oman |
Client/Operator: |
The Wave, Muscat |
Relevance: |
Consultancy design services for marina facility. |
Number of Berths: |
450+ (10-50 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design |
|
The Wave Muscat is one of the signature new developments currently under design and planning. The development combines more than 4,000 beautiful mixes of properties that will be the first integrated resort and residential development in the Muscat region.
Septech has been awarded the planning design, tender and construction supervision services associated with the development of the 450+ berth marina that will serve as the centrepiece of the development. The project is currently in the preliminary design stage and will utilise phased construction to parallel the surrounding upland development.
|
|
Barr Al Jissah
Location: |
Muscat, Oman |
Client/Operator: |
Turner Construction |
Relevance: |
New construction of pontoon system with sea flex |
Number of Berths: |
56 |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
Timeline: |
6 months |
|
Barr Al Jissah Marina is located off the beautiful coast of Oman nested alongside the rugged mountains and nearby the luxurious Shangri-La’s Barr Al Jissah Resort and Spa.
Septech designed and installed the floating pontoons utilising the ‘Seaflex’ anchoring system. Barr Al Jissah Marina was featured in the Marina World magazine in March/April 2006. |
|
Marina Mall
Location: |
Dubai, UAE |
Client/Operator: |
Emaar |
Relevance: |
New concrete marina pontoon system |
Number of Berths: |
92 (10-30 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
|
Marina Mall is one of the three marinas awarded to Septech under the Dubai Marina stage 3 contract with Emaar.
The marina utilises a unique layout in order to provide an attractive addition to Emaar’s luxurious Marina Mall development under construction simultaneously on land. The marina will utilise the same customised additions as constructed at the Dubai Marina Yacht Club. The marina facility will be an attractive addition to the Dubai Marina canal. |
|
West Marina
Location: |
Dubai, UAE |
Client/Operator: |
Emaar |
Relevance: |
New concrete marina pontoon system |
Number of Berths: |
68 (10-30 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction |
|
West Marina is one of the three marina projects that Emaar awarded to Septech under the Dubai Marina stage 3 contract.
The marina was second to be built following the Dubai Marina Yacht Club, and will utilise the same modern luxury concrete pontoon system and unique Emaar customisations and that were incorporated into the Dubai Marina Yacht Club project. |
|
Qarsana Island Marina
Location: |
Abu Dhabi, UAE |
Client/Operator: |
Private |
Relevance: |
First Unifloat Wave Attenuators® installation in the region |
Number of Berths: |
12 (15-30 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Design/Construction |
Timeline: |
5 months |
|
Qarsana Island Marina is located on a private island approximately 3 nautical miles off the coast of Abu Dhabi.
At Qarsana, we installed our Unfloat Wave Attenuators® for the first time in this region. Septech completed the design and construction of this marina facility which consists of new concrete marina pontoons, wave attenuators, a full set of utility services (electrical and water), and a gangway. |
|
Java Island
Location: |
The World, Dubai, UAE |
Client/Operator: |
GLR/Septech |
Relevance: |
Marina pontoon system and Unifloat Wave Attenuators® |
Number of Berths: |
50 (10-30 metre vessels) |
Quality Control: |
ISO 9001 |
Project Delivery: |
Planning/Design/Construction/Operations |
|
Java Island will be one of the most unique developments and be one of the first marinas constructed on The World development.
The marina will accomodate the residents of 52 villas and transient guests visiting the luxury spa facility and Lenny Kravitz sunset floating restaurant. The marina will be of first-class construction inclusive of all the customised dock accessories. The marina will incorporate special palm trees at the ends of its fingers to create a Bevery Hills Rodeo Drive feel. |
|